The Municipal Small Separate Sewer System (MS4) Permit is comprised of six elements, which are anticipated to greatly contribute to reducing pollution to water resources if implemented collectively. The six minimum control measures of the MS4 Permit are:
- Public Education and Outreach: Municipalities are required to provide educational material to four audiences - residents, industry, commercial, and construction - on how their activities impact stormwater.
- Public Participation: Municipalities are required to provide an opportunity for the public to participate in the development/implementation of their Stormwater Management Program (SWMP) at least annually. Notices must comply with state public notice requirements.
- Illicit Discharge Detection and Elimination: Municipalities are required to proactively and systematically find and eliminate sources of non-stormwater from their storm sewer system.
- Management of Construction Site Runoff: Municipalities are required to have an ordinance for management of stormwater discharges from construction sites that disturb one or more acres of land. The ordinance should include requirements for projects to implement sediment and erosion control practices as well as requirements for site plan review.
- Management of Post Construction Site Runoff: (New Development and Redevelopment): For development and redevelopment projects that disturb one or more acres of land, municipalities are required to address stormwater runoff by retaining it on site through low impact design techniques and green infrastructure practices.
- Good Housekeeping in Municipal Operations: Municipalities are required to implement good housekeeping practices in municipal operations, create pollution prevention plans for waste management facilities and maintenance garages, carry out street sweeping at least annually, and optimize catch basin cleaning.
View more information about the Winchendon Stormwater Program.